Main Features:
1 Full-automatic,assembly line work.
2 Laminating machine /gypsum ceiling production line.
3 High efficiency,stable rate of production.
4 Energy saving,labor saving.
Automatic gypsum board feeding machine
The cylinder push the gypsum board that above on the stack lift platform to the conveyor roll, Ready to laminate PVC and aluminum film
Double sided laminating machine
Effective lamination width: ≤ 1300mm
Thickness of sheet: 5-30mm
Lamination speed: 3-15m/min
Board feeding and releasing mode: automatic
Automatic cutting machine
Consist of two sets cutting system: vertical/longitudinal cutting and horizontal cutting, equipped dust collector system.
Cut the 1.2*2.4m big board to the 603*603mm/595*595mm small board.
Cutting speed: 15m/min
Cutting knife: vertical/longitudinal:3 blades; horizontal : 5 blades
Automatic Edge sealing machine
Control by the PLC, high speed, high output, edging tight and firm.
Sheet size: 600*600mm
Production speed: 25pieces/min
Electrical control: PLC
Automatic thermoplastic packing machine
Suitable for packing of PVC gypsum board finished product. The package id tight and smooth
Electric source: 380V
Power: 23KW
Speed: 500packs/hour
Standard packing temperature: 160-180ºC
Package material: PE heat shrinking film.
1. Suitable for long distance transportation
2. Small or key parts loaded in iron boxes
3. Iron boxes with welding
4. Naked
5. Please mark it in the sales contract for special package
Flowchart of making gypsum ceiling board:
Automatic board feeding--pre dusting--coating--drying and conveying-- aluminium foil unwinding--pneumatic lamination for film and gypsum board--cutting--conveying--automatic overturn--coating--drying and conveying--PVC film unwinding--pneumatic lamination for film and gypsum board--cutting--drying and conveying--lengthwise cutting--horizontal cutting--belt conveyor output--autolift stacking conveying--stretch packing--conveying--lift(finished products stacking)
* The predecessor is stated-owned enterprice,was built in the 1970s.
* A large manufacturer of integrated supply dedicated in researching,manufacturing, trading of building material machinery and construction materials .
* CE approved by the EU
* ISO 9001 certificate
*We have professional team and rich experience.
* We provide perfect after-sales service to solve customers' worries.
Installation:
Our company has three self-bulit installation teams with many years of installation experience.
Epuipped with professional installation engineers, process engineers and other thechnical personnel joint debugging, each production line to develop a debugging plan, from the dingle machine empty operation, system empty opeation to the system with the material operatjion, the whole production line with the material operation, every link accordording to the standard to test.
Training
The method of combining theory with practice is adpoted for the training. The installation engineer shall train the maintenance backbone personnel of the buyer,and the process engineer, equipment and operation engineer shall train the on-site front- line operators, so as to achieve the purpose of knowong the process, operation, equipment and maintenance.
If you have any doubt, pls contact me.